I have been working on the house until about 8:00 every night this week. It would not be so bad but I wake up at 3:45 to get to work by 5:30. I have been working on the baseboards and crown moulding. Getting the putty on and sanded takes time when you have about 400 linear feet of it to do. It looks way better now and will look perfect when it gets its final coat of paint. I got half of the threshold down going into our new bathroom and started cleaning up the whole area doing all the small finish stuff.
Today I am stopping on the way home to get more brad nails to finish off some of the kitchen and double vanity strips to cover gaps where the cabinetry meets the flooring or walls. I am also getting 3 more sticks of 3/4" PVC to run a water line to the jacuzzi for quick fill ups. I may as well since I have the hole open still where Gary and I ran the electrical line.
This weekend I should finish up a lot of small stuff like the mouldings and finally get the doors polyurethane coated so I can hang them and gets the casings on around the doors. Hopefully we can decide to hang more stuff up on the base walls and Megan can get the old living room cleaned out. Then we can finally finish off that room and get the old furnace hole covered up with the hardwood I pulled up and saved.
Thursday, January 17, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment