Mike just called about the dormers. He said he was having two put in the addition and I said that was not enough and that the existing dwelling has nothing. He said he would have his guy evaluate the situation who was there to do the two and based upon what he sees, he will most likly install more. Mike said the specs do not call for any to be done so the ones being done today are freebees. Hopefully they put the 6 in like we had talked about, 4 on the addition and two on the existing. Then if more are needed I will do them and possibly install the thermostatically controlled fan.
Mike also asked about the tub rough-in stuff which I told him was in the bathroom.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment