Apparently last Thursday or Friday the folks from Jacor (Subsiderary or owned by La Mesa Lumber) redid our window trim with the weather stripping which is why there was a small mess of weather stripping backing under the drywall. The kitchen window remains cracked, the south living room window does not stay up now, the window next to it has a tab that pops out and the window next to it has the bar that gets stuck, the window 2 from our bedrrom door is cracked and the last one is tempered so it needs to be moved.
The final framing inspection is supposed to occur today. That is where the plans must be as they are missing from the house.
We go the fascia/flashing painted white, two coats West and South, one coat East and none on the North. We go the old shit windows painted flat and will come back with semi-gloss this weekend in addition to doing the dark green.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment