Tuesday, June 12, 2007
2007 06 12
The final framing inspection occured yesterday (2007-06-11) and did not pass as some header plates are missing in addition to some bottom plate bolts. That is all we could tell from the spraypaint on the ground and walls. The paint was completed this past weekend and the stucco is waiting on the kitchen window to be replaced. After the framing issues are corrected the insulation goes in, is inspected and then drywall. The fire bell wire was run last Saturday and an additional outlet was run under the new living room windows. I'll get the speaker lines completed today in addition to framing out the shower niches.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment