Thursday, April 26, 2007
2007 04 26
Nothing was done today as we are in limbo about the fire sprinkler system. Mike says it could cost $6000 which is 2x what I have found. The siding will be completed soon as they ran out of material. The french doors will be fixed as they do not close easily anymore, The old south porch light will be installed in the siding as it was missed. Mike says the block/footing will suffice as it is not hanging off the edge.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment