Tuesday, March 6, 2007

2007 03 06

Tuesday the gravel was put down and the rebar was laid. Suppports were placed on the east perimeter wall at the north, middle and southern sides. The inspector signed the foundation paperwork. I called Mike and told him about the signature and he stated the pad may be poured tomorrow or Thursday (March 8th).

The guys that laid the gravel made a mess in the front yard on top of the area I park my truck. There is now what looks like, several hundred pounds of gravel on top of the bark I paid for just a couple months before the remodel began.

No comments: