Mike got back to us today:
Just to let you know everything including the sewer will work out as per plan. We will be correcting the problem on Mon. 29th. We will also be digging up the sewer on Mon. I told the concrete contractor to make 3 7-1/2" steps. This will drop the room 22-1/2" giving you 9'9" plus. We will probably be removing the water heater so we can ge to the sewer claen out that is right there. If we do remove the water heater the house will be without hot water for some time.
Saturday, January 27, 2007