This weekend I got the bathroom floor grouted in addition to the shower. We did some more painting in the bathroom and it should get completed in the next day or two. I made a mount for the bathroom fan vent, trimmed and routed the address for the front door area and mounted it... and raised the level of the dirt at the base of the back steps.
I have a fair amount of stuff to be done but it was a big thing to finally get the shower grouted. The floor looks great grouted and I can't wait till I can get the kitchen floor grouted too as it looks way better. The closet needs to be caulked at the bottom of the sheetrock as we are thinking of skipping the baseboards in the closet to get the cabinetry we buy, butted up against the wall. We just need to paint in there and then we can get the cabinetry. We are thinking of getting the dark cherry looking stuff from Lowes but will look at Ikea first.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment